At a Glance
- Full bathroom remodel: $14,000 to $35,000
- Time on site: 1 to 2 weeks once we start
- Lead time: about 4 to 6 weeks from order, because materials are made for your room
- Permits: City of Raytown, if your house is inside city limits
- Who shows up: our own employees, never subcontractors
What's Usually Behind the Walls of a 1950s or 60s Raytown Bathroom
Nearly nine in ten Raytown homes were built before 1980. Here’s what we often find when the old bathroom comes out, and how we plan for it before you sign anything.
| What we often find | Why it matters | How we handle it |
| Wall tile set in a thick mortar bed | Heavy and slow to remove, with lots of debris | Priced as a full tear-out from the start, not added later |
| Steel or cast-iron tub | Cast iron can weigh a few hundred pounds | Removal is planned and included in your quote |
| Galvanized steel supply pipe | Rusts inside, lowers water pressure, and can start to leak | With the wall open, we can replace the run inside the bathroom |
| Cast-iron drain lines | Can crack or corrode after 60+ years | We check what’s visible, often from the basement, and price repairs up front |
| A window instead of an exhaust fan | Steam stays in the room, so paint peels and grout mildews | A fan ducted to the outside |
| Two-prong outlets with no GFCI | Unsafe near water | GFCI protection, plus a new circuit if needed (permitted work in Raytown) |
| A fiberglass tub or glued-on surround from a later update | Often installed over the original walls, and seams let water in | Taken down to the studs and replaced with a waterproofed system |
| Paint from before 1978 | May contain lead | Handled with lead-safe practices during demo |
If the original floor tile is still down under newer flooring, it’s worth testing before it’s torn out. We’ll talk through that at the consultation.